Plumbing Services
| Work Description | Unit of Measure | Labour Only (EUR) |
|---|---|---|
| Standard Plumber Call-Out Charge (inc. first hour) | per visit | 60.00 – 90.00 |
| General Plumbing Hourly Rate (subsequent hours) | per hour | 40.00 – 65.00 |
| Emergency / Out-of-hours Call-Out Charge (inc. first hour) | per visit | 90.00 – 140.00 |
| Emergency Hourly Rate (subsequent hours) | per hour | 70.00 – 100.00 |
| Threaded joint sealing and re-packing (PTFE/Flax) | per joint | 25.00 – 40.00 |
| Copper pipe joint / fitting replacement | per joint | 30.00 – 50.00 |
| Copper pipe soldering and leak repair | per joint | 40.00 – 65.00 |
Plumbing Installation Rates
| Work Description | Unit | Labour Only (EUR) |
|---|---|---|
| 1. Toilets | ||
| Standard floor-mounted toilet installation | unit | 80.00 – 120.00 |
| Wall-hung toilet installation (frame & pan) | unit | 180.00 – 250.00 |
| Cistern mechanism repair / replacement | unit | 50.00 – 80.00 |
| 2. Washbasins | ||
| Standard pedestal washbasin installation | unit | 70.00 – 100.00 |
| Wall-mounted basin installation | unit | 60.00 – 90.00 |
| Vanity unit with integrated basin installation | unit | 90.00 – 140.00 |
| 3. Taps & Mixers | ||
| Basin mixer tap installation | unit | 40.00 – 60.00 |
| Kitchen sink mixer tap installation | unit | 45.00 – 65.00 |
| Bath/Shower wall-mounted mixer installation | unit | 60.00 – 90.00 |
| Waste trap / P-trap replacement | unit | 35.00 – 55.00 |